Matt Edson, Ed Fletcher, Gizmo, John Hudachek, Jon Knickerbocker, Gary Montgomery and Jim Nikiforakis joined Friends of Pisgah trails chief John Herrick and his John Deere tractor on a cool crisp December morning at the Kilburn trail head.  Using the tractor, rakes and shovels, culverts were cleaned, water bars installed and ditches dug along the side of the road to Kilburn Pond and the trail on the west side of the Kilburn loop.  This allows water to channel off the road and trail surface and not run down and erode the middle of the trail.  The crew worked from 10am-3pm.