The Friends of Pisgah volunteers met at the Upper Reservoir Road Trailhead off Route 119 in Winchester at 9:00am Saturday, August 17th. FOP President Matt Edson, Abe and Sam Howe, Gerry Croteau, John Hudachek, David Weisel and Pisgah State Park Manager Whip Newell transported all the bridge materials and tools to the bridge site and rebuild the second bridge from the south end of Pisgah Reservoir trail. By early September the goal is to also rebuild the third bridge.