WE ICED IT. Today, Saturday the 20th, nine Friends of Pisgah souls moved enough materials over the Kilburn Loop Trail and Kilburn Pond to build two foot bridges, one that will be 22-feet in length and the other 24-feet long. The materials are to be assembled into spans in the spring on the soon to the formally brushed out John Summers Trail on the eastern side of Kilburn Pond. On our Facebook page we see folks moving on ATV machines with hauling sleds attached and volunteers pulling lumber from the sleds and piling the material where it will be readily accessible in two different locations. Despite some logistical difficulties while moving half a ton of material up icy hills, the work was completed in six hours. Not a bad day's work.


K.r. Nilsen